  • From Construction to Commissioning: The Metals Behind Modern Data Centers

    When you picture a data center, rows of servers are probably the first thing that come to mind. But long before those servers begin processing data, an enormous amount of physical infrastructure has to be built around them. 

    Power needs to reach the site and move throughout the facility. Equipment needs to stay cool. Backup systems need to be ready when they’re needed. Mechanical and electrical systems need to work together reliably. 

    And once a data center opens, the work doesn’t stop. From initial construction to equipment deployment, commissioning, maintenance, and future expansion, metals play an important role throughout the data center lifecycle. 

    It Starts With Power

    One of the biggest challenges facing modern data centers is getting enough electricity to the facility in the first place. 

    The International Energy Agency estimates data centers consumed around 415 terawatt-hours of electricity globally in 2024, about 1.5% of total global electricity consumption. That demand is expected to rise considerably as more computing capacity comes online.  

    The growth is particularly noticeable in the United States. A 2026 update from Lawrence Berkeley National Laboratory estimates data centers could account for 11.8% of total U.S. electricity use by 2030, with modeled scenarios ranging from 9.5% to 15.3%.  

    Supporting that level of demand takes infrastructure. Depending on the site, electricity may travel through substations, transformers, switchgear, uninterruptible power supply systems, power distribution equipment, busways, and other electrical systems before it ever reaches computing equipment. 

    That creates demand for copper and copper alloys, steel, stainless steel, specialty alloys, cable, electrical components, fabricated assemblies, and other industrial products throughout the supply chain

    Building the Facility

    Once power is available, construction brings another layer of material requirements. 

    A modern data center incorporates structural systems, electrical equipment, backup generators, cooling infrastructure, piping, fire-protection systems, mechanical equipment, controls, cable-management systems, and thousands of individual components. 

    Copper is particularly visible because of its role in electrical infrastructure. A Copper Development Association market study identifies copper across data-center power controls, cabling, power distribution, busways, information technology equipment, and heating, ventilation, and air-conditioning systems.  

    But copper is only one part of the metals story. Stainless steels and specialty alloys can be important where corrosion resistance, strength, temperature performance, or long service life are required. Welding consumables support the fabrication and installation of equipment and structures. Wire, cable, springs, fasteners, connectors, and other components may be small individually, but they’re repeated throughout complex electrical and mechanical systems.

    Deployment Brings Everything Together

    Finishing the building isn’t the same as finishing the data center. 

    Electrical distribution, backup generation, cooling equipment, networking infrastructure, controls, security systems, and computing equipment all have to be installed and integrated. 

    Cooling is becoming an especially important part of that conversation. In a typical modern data center, cooling can represent roughly 7% of electricity consumption in an efficient hyperscale facility and more than 30% in some less-efficient enterprise facilities, according to the International Energy Agency. 

    As AI increases computing density and heat output, liquid cooling is becoming more important for high-performance infrastructure. The Copper Development Association highlights copper cold plates as a key component of direct-to-chip liquid cooling, where coolant removes heat directly from high-power processors before transferring that heat through the wider cooling system.  

    So the metals behind data centers are helping move electricity, heat, coolant, mechanical loads, and information throughout it

    Copper Electrical Wiring

    Then Comes Commissioning

    Before a mission-critical facility can operate as intended, its systems must work together. That’s where commissioning enters the picture. 

    Power, cooling, controls, life-safety systems, backup equipment, and other infrastructure need to be tested and verified, both individually and as connected systems. Commissioning generally stretches beyond a simple final inspection and can continue from design and construction through testing, turnover, and operation.  

    A backup generator needs to start when power is lost. A cooling system needs to respond when thermal loads change. Electrical infrastructure needs to handle expected loads. Redundant systems need to operate as designed when equipment is unavailable, which means everything has to work together. 

    For a facility designed around reliability and continuous operation, material and component performance become an important part of that equation.

    Opening Day Isn't the Finish Line

    Perhaps the most overlooked part of the data center lifecycle begins after commissioning. 

    Data centers have to operate continuously for years. During that time, generators are serviced. Cooling systems are maintained. Components wear. Connections are inspected. Equipment is repaired or replaced. 

    The facility itself can change, too. More computing capacity may be added. Power requirements can increase. Air-cooled infrastructure may be supplemented or replaced by liquid cooling. Electrical distribution systems can be upgraded to accommodate denser computing equipment. 

    That creates an ongoing cycle: 

    Build. Deploy. Maintain. Upgrade. Expand. 

    AI could accelerate that cycle even further. 

    The International Energy Agency reported that electricity demand from data centers increased 17% in 2025, while AI-focused facilities grew even faster. As computing requirements change, the physical infrastructure supporting them will have to evolve as well.

    Materials Matter Throughout the Lifecycle

    A lot of attention around artificial intelligence understandably focuses on computing hardware. But servers can’t operate on their own. 

    Behind them sits electrical infrastructure, backup generation, cooling equipment, controls, structural systems, cable, connections, and thousands of individual manufactured components. 

    Those systems have to be: 

    • Built. 
    • Then they have to be installed. 
    • Tested. 
    • Maintained. 
    • And eventually upgraded. 

    For manufacturers and material suppliers, that’s what makes the growth of data centers especially interesting. The opportunity isn’t limited to the initial construction project. It’s part of a much longer infrastructure lifecycle. 

    And as data centers become larger, denser, and more important to the way the world operates, the materials supporting that infrastructure will have an increasingly important job to do